The Module Collection
Exterior models to interior finish details — scroll through every layer of the build.
Ridge 440
Single-bedroom retreat. Cedar cladding. Passive solar orientation.
Mesa 880
Open-plan living. Rammed earth tones. Roof deck standard.
Coast 1200
3-bed, 2-bath. Salt-rated hardware. Elevated foundation ready.

Loft Joinery
White oak cabinetry. Dovetail joinery. Delivered pre-assembled.

Urban 1600
4-bed urban infill. Rooftop terrace. Zoning-compliant stack.

Mechanical Core
All MEP factory-tested. 96% efficiency HVAC. Arrives certified.

Sierra 2400
Primary residence scale. 5-bed, 4-bath. Timber + steel hybrid.
Italian Tile Bath
Calacatta tile. Kohler fixtures. Waterproofed in-factory.
Factory to Foundation
Eighteen months of traditional construction, compressed into twelve weeks. Here's exactly how.
Configured in Days
You select terrain, footprint, and finish level. Our engineers generate structural drawings, MEP plans, and permit packages — all within 5 business days.
5-day turnaroundBuilt in Climate Control
Every wall panel, cabinet run, and tile installation happens inside our 180,000 sq ft facility — no weather delays, no subcontractor no-shows, no surprises.
10–11 weeks in-factoryFlatbed to Foundation
Fully finished modules arrive on flatbed trucks. Each module is GPS-tracked from our facility gate to your foundation. Crane set takes 4–6 hours.
Same-day crane setPlug In. Move In.
Utility hookups, final inspection, and certificate of occupancy — typically completed within 72 hours of set. Keys in hand by end of week.
72-hr to occupancyChoose Your Finish Level
Three tiers. Every one factory-finished, code-compliant, and crane-ready. The difference is in the details.
Essential
Precision without excess.
- Engineered hardwood floors
- Quartz countertops
- Kohler plumbing fixtures
- Mini-split HVAC
- LED lighting package
- Standard window package
- Italian tile baths
- Custom cabinetry
- Smart home integration
Architect
Dwell-magazine design, delivered.
- Polished concrete or wide-plank oak
- Calacatta marble surfaces
- Italian tile wet areas
- Architect-specified cabinetry
- Lutron lighting control
- Thermally-broken window wall
- ERV fresh air system
- Radiant floor heating
Bespoke
No catalog. Just your vision.
- Everything in Architect
- Material selection with our design team
- Custom structural modifications
- Integrated AV & smart home
- Rooftop terrace or ADU additions
- Site-specific foundation engineering
From the Clients
I've overseen twelve construction projects. This was the first one that finished ahead of schedule. The module arrived looking like a Dwell cover shoot — we moved in four days later.

Marcus Chen
CTO, Meridian AI · Tahoe second home
We were skeptical — 'prefab' conjured images of double-wides. Then we walked in. Sealed concrete floors, Italian tile, Lutron dimmers. Our architect couldn't believe it wasn't site-built.

Priya Nair
Architect, Nair & Hollis Studio · Client project
We had 22 units on a tight infill lot. Traditional build: 24 months, $2.1M over budget on the last project. With Prefab: 14 months, on budget. The math is obvious once you've seen it work.

Jordan Whitfield
Principal, Whitfield Development Group