Completed prefab module interior at dusk — floor-to-ceiling glass framing mountain treeline, amber pendant lights over polished concrete island
Built in 12 weeks.Delivered in one day.

Precision-engineered living spaces. Factory-finished. Foundation-ready.

12 WeeksBuild Time
1 DayDelivery Window
340+Modules Completed
99.2%Client Satisfaction
CoastalMountainUrbanDesertBespokeArchitectEssentialPrecisionCoastalMountainUrbanDesertBespokeArchitectEssentialPrecision

The Module Collection

Exterior models to interior finish details — scroll through every layer of the build.

Ridge 440 prefab module exterior — mountain setting with floor-to-ceiling glass and cedar cladding at dusk
Mountain Series

Ridge 440

Single-bedroom retreat. Cedar cladding. Passive solar orientation.

0sq ft
Mesa 880 prefab module exterior — desert landscape with concrete and steel facade, wide overhanging roof
Desert Series

Mesa 880

Open-plan living. Rammed earth tones. Roof deck standard.

0sq ft
Coast 1200 prefab module exterior — oceanfront setting with white-painted steel and panoramic windows
Coastal Series

Coast 1200

3-bed, 2-bath. Salt-rated hardware. Elevated foundation ready.

0sq ft
Close-up of custom white oak joinery in prefab module kitchen — dovetail drawer joints, brushed brass pulls
Interior Detail

Loft Joinery

White oak cabinetry. Dovetail joinery. Delivered pre-assembled.

Urban 1600 prefab module exterior — city lot setting with black steel cladding and rooftop terrace
Urban Series

Urban 1600

4-bed urban infill. Rooftop terrace. Zoning-compliant stack.

0sq ft
Exposed mechanical systems in prefab module — copper plumbing, conduit runs, factory-sealed connections
Systems Detail

Mechanical Core

All MEP factory-tested. 96% efficiency HVAC. Arrives certified.

Sierra 2400 prefab module exterior — large mountain retreat with stone base, timber frame, and wrap-around deck
Mountain Series

Sierra 2400

Primary residence scale. 5-bed, 4-bath. Timber + steel hybrid.

0sq ft
Italian marble tile bathroom in prefab module — floor-to-ceiling Calacatta tile, freestanding soaking tub, brass fixtures
Finish Detail

Italian Tile Bath

Calacatta tile. Kohler fixtures. Waterproofed in-factory.

Factory to Foundation

Eighteen months of traditional construction, compressed into twelve weeks. Here's exactly how.

PHASE_01

Configured in Days

You select terrain, footprint, and finish level. Our engineers generate structural drawings, MEP plans, and permit packages — all within 5 business days.

5-day turnaround
PHASE_02

Built in Climate Control

Every wall panel, cabinet run, and tile installation happens inside our 180,000 sq ft facility — no weather delays, no subcontractor no-shows, no surprises.

10–11 weeks in-factory
PHASE_03

Flatbed to Foundation

Fully finished modules arrive on flatbed trucks. Each module is GPS-tracked from our facility gate to your foundation. Crane set takes 4–6 hours.

Same-day crane set
PHASE_04

Plug In. Move In.

Utility hookups, final inspection, and certificate of occupancy — typically completed within 72 hours of set. Keys in hand by end of week.

72-hr to occupancy

Choose Your Finish Level

Three tiers. Every one factory-finished, code-compliant, and crane-ready. The difference is in the details.

Essential

Precision without excess.

From $285 / sq ft
  • Engineered hardwood floors
  • Quartz countertops
  • Kohler plumbing fixtures
  • Mini-split HVAC
  • LED lighting package
  • Standard window package
  • Italian tile baths
  • Custom cabinetry
  • Smart home integration
Most Selected

Architect

Dwell-magazine design, delivered.

From $385 / sq ft
  • Polished concrete or wide-plank oak
  • Calacatta marble surfaces
  • Italian tile wet areas
  • Architect-specified cabinetry
  • Lutron lighting control
  • Thermally-broken window wall
  • ERV fresh air system
  • Radiant floor heating

Bespoke

No catalog. Just your vision.

Custom quote
  • Everything in Architect
  • Material selection with our design team
  • Custom structural modifications
  • Integrated AV & smart home
  • Rooftop terrace or ADU additions
  • Site-specific foundation engineering

From the Clients

"
I've overseen twelve construction projects. This was the first one that finished ahead of schedule. The module arrived looking like a Dwell cover shoot — we moved in four days later.
Sierra 2400Model
11 weeksTimeline
ArchitectFinish
Marcus Chen headshot — tech executive in casual attire

Marcus Chen

CTO, Meridian AI · Tahoe second home

"
We were skeptical — 'prefab' conjured images of double-wides. Then we walked in. Sealed concrete floors, Italian tile, Lutron dimmers. Our architect couldn't believe it wasn't site-built.
Coast 1200Model
12 weeksTimeline
BespokeFinish
Priya Nair headshot — architect with warm smile

Priya Nair

Architect, Nair & Hollis Studio · Client project

"
We had 22 units on a tight infill lot. Traditional build: 24 months, $2.1M over budget on the last project. With Prefab: 14 months, on budget. The math is obvious once you've seen it work.
22 modulesUnits
14 monthsTimeline
EssentialFinish
Jordan Whitfield headshot — real estate developer in professional attire

Jordan Whitfield

Principal, Whitfield Development Group